Sewer Services | Ted Berry Company | Maine

Sewer

Pumping
The Ted Berry Company can help design, plan, install and operate municipal bypass systems up to 80MGD and for durations from one hour to one month.
Read More >
Pipe Cleaning
The Ted Berry Company has the experience and equipment to assist collection system managers in developing, planning and execution of preventive maintenance programs in communities large and small throughout New England.
Read More >
HDPE Fusion and Fabrication
Ted Berry Company can fabricate HDPE pipe to meet the demands of sewer utilities in ranges from 2” to 36” with highly competent and trained personnel.
Read More >
Pipe Inspection
The Ted Berry Company knows that success of our communities relies on reliable and safe infrastructure systems. This can be achieved through continual inspection, maintenance and rehabilitation of our critical buried sewer systems.
Read More >
Pipe Bursting
Ted Berry Company provides pipe bursting which is a well-established method that is used to replace an existing pipe in place with a new pipe that has the same or larger diameter. Pipe bursting is a trenchless pipe replacement method reducing excavation by as much as 95%.
Read More >
Slip Lining
The Ted Berry Company can help design and build sliplining solutions for sewers ranging from small diameter (8”-24”) to large diameter (30”-120”) utilizing various materials and techniques that can reduce the need to excavate a trench as well as lower total construction costs by minimizing risk, managing flows and by-pass, and maximizing the existing pipe ID.
Read More >
UV CIPP
Ted Berry Company is helping communities structurally renew aging sewer systems while protecting them against future corrosion and deterioration while protecting them against future corrosion and deterioration by rehabilitating using UV CIPP in pipe sizes ranging from 6” to 54”.
Read More >
Pipeline Pigging
The Ted Berry Company cleans sanitary sewer force mains with the progressive poly pigging method which propels a “pig” through the pipeline removing material as it travels.
Read More >
Hydro-excavation
The Ted Berry Company Team cross bore prevention program for lines to be installed by HDD and utility potholing services are critical components to a comprehensive damage preventing program. By accurately locating, documenting condition, mapping, and exposing buried utilities construction can take place with reduced risk to contractors, municipal utility owners, and the general public.
Read More >
Vacuum Services
The Ted Berry Company team provides competent personnel trained in confined space entry with the equipment required to safely and efficiently remove grit and solids from pumping stations, aeration chambers, oxidation ditches, tanks, grit chambers, and head works structures to help municipal and industrial facility operator maintain environmental compliance and operational efficiencies.
Read More >
CIPP Sectional Point Repairs
The Ted Berry Company trenchless CIPP sectional point repair system is a NO-DIG process where a structural liner is installed in an existing pipe to repair a defect without the need to excavate or repair the entire line. The CIPP point repair system uses a liner impregnated with a thermal setting resin which is expanded and cured to form a tight fitting liner within the existing pipe, the CIPP process incorporates the existing pipe into the finished product to produce improved performance to the original pipe and a long term structural solution.
Read More >